The demand for electrical energy on the Spanish peninsula was 19,877 GWh in the month of April, representing an increase of 5.5% with respect to the same month last year.

The demand for electrical energy on the Spanish peninsula was 23,644 GWh in the month of January representing an increase of 0.2% with respect to the same month last year.

The demand for electrical energy on the Spanish peninsula was 21,897 GWh in the month of February representing an increase of 6.1% with respect to the same month last year.

Today at 18:22, the 220 kilovolt (kV) electricity line which runs between Vic (Barcelona) and Juià (Gerona) was reconnected after suffering a disconnection yesterday at 16:53 due to strong winds an

The demand for electrical energy on the Spanish peninsula was 22,695 GWh in the month of March, representing an increase of 8.9% with respect to the same month last year.