Electricity Control Centres

Our control centres are the brain of the electrical system. It manages electricity in real-time, 24 hours a day, to ensure reaches different supply points whenever it is needed. 

Cecoel

Precision and Neutrality in Real-Time

From our control centres, we guarantee the correct operation of the Spanish electricity system.

The Electricity Control Centre (Cecoel), located in Madrid, is the hub from which electricity is managed in real-time: it is responsible for the coordinated operation and supervision of the Spanish electrical system's generation and transmission facilities around the clock, to maintain the constant balance between energy production and demand. To achieve this, it receives, analyses, and processes around 240,000 data points every moment.

Additionally, we have control centres in the Balearic and Canary Islands, from which we operate the electricity and ensure the proper functioning of the electrical system in these territories.

Access to the Non Peninsular Systems

How Does Cecoel Operate?

 

icon

It receives real-time information about facilities not owned by Red Eléctrica from control centres designated for the transmission of real-time telemetry.

Líneas electricas

It continuously monitors the state of the grid and its components, as well as their electrical parameters. It does so through a telecommunications network that acts on control variables to maintain supply security and quality.

Despacho no peninsular

It processes the information received from production plants and grid facilities so operators can analyse it and take actions to ensure system safety.

 

Hibridas

In order to control and manage variations in demand and possible unavailability of the generating equipment, it issues the operating instructions necessary for the correct programming of electrical production and international exchanges.

TresCantos

24 Hours a Day, 365 Days a Year

Whenever you ask for power from the socket, you get it. But how do our operators do it? Find out through this virtual visit to Cecoel. 

 

Available only in Spanish.

Cecoel receives, analyses, and processes around 240,000 data points every moment to carry out its mission of real-time electricity system operation

See the curves in real time

We provide you with the electricity demand and production curves for each electricity system in Spain.

Consulta las curvas
banner-mask-brain-ree

This Is How the Largest Renewable Control Centre Works: Cecre

Red Eléctrica's Renewable Energy Control Centre, our Cecre, was the first in the world dedicated exclusively to the secure integration of electricity from renewable technologies, such as solar photovoltaic and wind power.

Download redOS

Our app to obtain electricity system data on your device.

App storeGoogle play

Descarga redOS

App storeGoogle play

Electricity system data

Examine the primary metrics and utilise graphs and comparisons to assess and understand the trends within the Spanish electricity system.

Los datos del sistema eléctrico