Today at 18:22, the 220 kilovolt (kV) electricity line which runs between Vic (Barcelona) and Juià (Gerona) was reconnected after suffering a disconnection yesterday at 16:53 due to strong winds an

The demand for electrical energy on the Spanish peninsula was 22,695 GWh in the month of March, representing an increase of 8.9% with respect to the same month last year.

The demand for electrical energy on the Spanish peninsula reached 20,415 GWh in the month of June, representing an increase of 3.7% with respect to the same month in 2009, and a growth of 0.2% in g

The demand for electrical energy on the Spanish peninsula reached 23,291 GWh in the month of July, representing an increase of 3.3% with respect to the same month in 2009, and a growth of 3.4% in g