For 40 years, we've been driving our country's economic and social progress. Four decades shaping Spain.
The declaration of General Interest regarding the project for the Tenerife-La Gomera underwater interconnection line and its associated infrastructure by the Island Council of the Canary Isla

The European Investment Bank (EIB) has approved a €300 million loan to finance the construction of the Salto de Chira pumped-storage hydroelectric power plant being built by Red Eléctrica, a s
Red Eléctrica, Redeia’s subsidiary responsible for electricity operation and transmission in Spain, has commissioned a new 220 kV line between Lousame and Tibo.

This new interconnection consists of an underwater 132 kV double circuit link circuit between the islands of Ibiza and Formentera, which connects the Torrent substation, in Santa Eulària des Riu, and a new substation built in Formentera, in the Es Ca Marí industrial area.

The European platform Renewables Grid Initiative (RGI) has recognised in the ‘Environmental Protection’ category of the Good Practice of the Year Award 2022 the research project ‘Bio Tran
The new 132 kV interconnection between Lanzarote and Fuerteventura is now a reality.
Para consultas de medios de comunicación:
Tel.: 91 453 33 33 / 91 453 32 81 / 91 728 62 17 | gabinetedeprensa@ree.es