For 40 years, we've been driving our country's economic and social progress. Four decades shaping Spain.

The Red Eléctrica Group today announced the financial information relating to the first nine months of 2021, a period in which the Company's profit totalled 550.8 million euros.

{"preview_thumbnail":"/sites/default/files/styles/video_embed_wysiwyg_preview/public/video_thumbnails/jv5Ybx7raRA.jpg?itok=mndR9nVm","video_url":"https://www.y

{"preview_thumbnail":"/sites/default/files/styles/video_embed_wysiwyg_preview/public/video_thumbnails/4vslM9EGGWU.jpg?itok=nRKtSRso","video_url":"https://www.youtube.com/watch?v=4vslM9EGGWU&t",

Red Eléctrica de España, the sole transmission agent and operator of the national electricity system, today begins construction of the land sections of the route in Ibiza and Formentera of the new

The Red Eléctrica Group, through Hispasat (the Spanish telecommunications operator), Red Eléctrica de España (the transmission agent and operator of the Spanish electricity system) and Elewit (the

Red Eléctrica de España (REE) has commissioned the new 220 kilovolt (kV) Mazaricos-Lousame line, which runs through the municipalities of Lousame, Rois, Brión, Negreira, Outes and Mazaricos.

National electricity demand in September is estimated at 21,073 GWh, a value that is 2.8% higher than the figure registered in the same month last year.

Red Eléctrica de España has commissioned a new electricity transmission line connecting the Renedo substation with the La Mudarra substation, in Valladolid.

The Chairwoman of the Red Eléctrica Group, Beatriz Corredor, and the President of the Regional Government of Extremadura, Guillermo Fernández Vara, met today in Mérida with the aim of continuing to

National electricity demand in August is estimated at 22,250 GWh, a value that is 0.9% higher than the figure registered in the same month last year.